Projects

NE 142nd Ave. & Grace Ave. Water Main Replacement

Windsor Engineers prepared preliminary design analysis and design documents for Clark Public Utilities for a new water main from NE 159th Street in Brush Prairie to Eaton Boulevard in Battle Ground.

The new pipeline features crossings of Salmon Creek, a railroad, and a regional gas pipeline. The Windsor team includes subconsultants Columbia West Engineering, Cascade Trenchless Technologies, Otak, and Minister Glaeser Surveying.