top of page
FORT VANCOUVER REGIONAL LIBRARY
The aging Ridgefield branch of the Fort Vancouver Regional Library was in need of upgrades. As part of the project, all existing MEP systems and part of the 8,100 square foot structure were demolished. A highly efficient variable refrigerant flow (VRF) system was installed. In addition to the HVAC design, Windsor also provided design of the electrical, plumbing, and low voltage systems.
bottom of page